Project Description

A small duct System installed inside a dropped ceiling of pantry with 250mm solid spine ductwork running underneath the posi struts. There was a combination of linear grilles and round grilles. The heating was from a 35kW Immergas Condensing Hydronic boiler and the Air conditioning was a Lennox 3 phase refrigerated Add On unit.