Project Description

These photos show the finished installation of Rehau red Pex A pipe onto the foam positioning board. Every in slab installation is pressurized and the water pressure gauge is monitored during the concrete pour so ensure the pipe is not damaged. The manifold is a brass Rehau manifold and the boiler was a Bosch Combi boiler. Note the pink spray indicating the kitchen bench and stairs.